Engineering

  • A photo of a sump pump with a blue hue over the image and the words Sump Pump Spring Switch and the City of Moorhead logo in white
    Spring Reminder: Time to Redirect Your Sump Pump!

    As the spring showers roll in, the City of Moorhead wants to remind residents that it’s time to direct your sump pump discharge outside.

    Between now and October 1, sump pumps must not drain into the sanitary sewer system. Instead, they should be directed:

    • Into the storm sewer via a proper connection
    • On the ground at least 20 feet away from your home
    • Through a buried line to the curb

    Why it matters:
    Sending sump pump water into the sanitary sewer overwhelms the system, especially during heavy rains, leading to potential sewer backups and costly property damage. This excess water can impact not just your home, but your entire neighborhood.

    Before you redirect your discharge line outdoors, double-check that the line is clear of ice and blockages to avoid any overflow or flooding.

    It’s a small switch that makes a big difference.
    By helping prevent sewer backups and keeping our system running efficiently, you’re protecting your home, and doing your part for the community.

    Learn more about sump pump requirements and wastewater management.

  • News Release with City of Moorhead logo in white on a blue background
    City invites public feedback on 1 Ave N Study

    The City of Moorhead is evaluating improvement options for 1 Ave N from 12 St to Center Avenue (Hwy 10) in Moorhead. Ongoing redevelopment, revitalization, and deteriorating pavement conditions along the corridor has prompted an evaluation of the corridor for future reconstruction.

    The project will evaluate current and future conditions and utilize public feedback to develop corridor concepts for future implementation. Public feedback is being collected through a project website to gather information on topics such as safety, pedestrian/mobility access, pavement conditions, and business access.  

    The current construction timeline is tentatively planned for 2027 or 2028.