a scenic view of stave church

Building Plumbing and Heating Fee Schedule

Total Valuation

  •  $ 1.00 to $ 1 ,000.00
    •  $30.00
  • $ 1,001.00 to $100,000.00
    • $30.00
      • For the first $1,000.00 plus $4.60 for each additional 
        $1,000.00 or fraction thereof, to and including 
        $100,000.00 
  • $ 100,001.00 and up
    • $490.00
      • For the first $100,000 plus $2.30 for each additional 
        $1,000.00 or fraction thereof 
  • Sanitary Sewer Hook Up Fee
  • Stormwater Permit Fee
    • $25.00

*A Minnesota State Surcharge is applied to all building permits at a rate of $0.50 per $1,000.00 of total valuation up to $1 million. For surcharge rates on valuations over $1 million, refer to MN Statute 326B.148.

*An investigation fee equal to the permit fee shall be charged whenever work is started prior to obtaining a permit.

Total Valuation

  • $1-$1,000
    • Fee: $37.00
  • $1,001 - $25,000
    • Fee: $37.00
      • for the first $1,000.00 plus $8.60 for each additional $1,000.00 or fraction thereof to and including $25,000.00
  • $25,001 - $50,000
    • Fee: $248.00
      • for the first $25,000.00 plus $6.90 for each additional $1,000.00 or fraction thereof to and including $50,000.00
  • $50,001 - $100,000
    • Fee: $421.00
      • for the first $50,000.00 plus $4.60 for each additional $1,000.00 or fraction thereof to and including $100,000.00
  • $100,001 and up
    • Fee: $655
      • for the first $100,000.00 plus $4.00 for each additional $1,000.00 or fraction thereof
Additional Fees:
  • Plan Review Fee for commercial plan review - 25% of the attributable building permit fee.
  • New Construction - Sanitary sewer hook-up fee.
  • Commercial (new and additions) - stormwater permit is $25.00 plus $12.50/acre.

*A Minnesota State Surcharge is applied to all building permits at a rate of $0.50 per $1,000.00 of total valuation up to $1 million. For surcharge rates on valuations over $1 million, refer to MN Statute 326B.148.

*An investigation fee equal to the permit fee shall be charged whenever work is started prior to obtaining a permit.

Total Valuation

  • $1-$1,000
    • Fee: $37.00
  • $1,001 - $25,000
    • Fee: $37.00
      • for the first $1,000.00 plus $8.60 for each additional $1,000.00 or fraction thereof to and including $25,000.00
  • $25,001 - $50,000
    • Fee: $248.00
      • for the first $25,000.00 plus $6.90 for each additional $1,000.00 or fraction thereof to and including $50,000.00
  • $50,001 - $100,000
    • Fee: $421.00
      • for the first $50,000.00 plus $4.60 for each additional $1,000.00 or fraction thereof to and including $100,000.00
  • $100,001 and up
    • Fee: $655
      • for the first $100,000.00 plus $4.00 for each additional $1,000.00 or fraction thereof

*A Minnesota State Surcharge is applied to all building permits at a rate of $0.50 per $1,000.00 of total valuation up to $1 million. For surcharge rates on valuations over $1 million, refer to MN Statute 326B.148.

*An investigation fee equal to the permit fee shall be charged whenever work is started prior to obtaining a permit.

Total Valuation

  • $1.00 to $500.00
    • $17.00
  • $501.00 to $1,000.00
    • $38.00
  • $1,001.00 to $10,000
    • $38.00
      • For the first $1,000.00 plus $6.80 for each additional $1,000.00 or fraction thereof, to and including $10,000.00
  • $10,001 to $50,000
    • $100.00
      • For the first $10,000.00 plus $4.20 for each additional $1,000.00 or fraction thereof, to and including $50,000.00
  • $50,001 to $100,000
    • $270.00
      • For the first $50,000.00 plus $2.60 for each additional $1,000.00 or fraction thereof, to and including $100,000.00
  • $100,001 and up
    • $400.00
      • For the first $100,000 plus $1.40 for each additional $1,000.00 or fraction thereof

*A Minnesota State Surcharge is applied to all mechanical permits at a rate of $0.50 per $1,000.00 of total valuation up to $1 million. For surcharge rates on valuations over $1 million, refer to MN Statute 326B.148.

*An investigation fee equal to the permit fee shall be charged whenever work is started prior to obtaining a permit.

  • For the first four (4) fixture openings
    • $32.00
  • For each fixture opening over four (4)
    • $5.00
  • New Water Taps, each
    • $43.00
  • New Sewer Taps, each
    • $43.00

*A Minnesota State Surcharge of $1.00 is applied to plumbing permits.

*An investigation fee equal to the permit fee shall be charged whenever work is started prior to obtaining a permit.

System reviewed water distribution & drain, waste & vent systems, including interceptors, separators, or catch basins

  • 25 or fewer drainage fixture units
    • $107.00
  • 26 to 50 drainage fixture units
    • $193.00
  • 51 to 150 drainage fixture units
    • $267.00
  • 151 to 249 drainage fixture units
    • $383.00
  • 250 or more drainage fixture units
    • $3.00
      • Per drainage fixture unit to a maximum of $2,730.00 and $53.00/interceptor, separator, or catch basin
  • Building Sewer Service Only
    • $107.00
  • Building Water Service Only
    • $107.00
  • Building Water Distribution System Only (no drainage system)
    • $4.00
      • Per supply fixture unit to a maximum of $100.00
  • Storm Drainage System
    • $175.00
      • Minimum fee, or $42.00 per drain opening, up to a maximum of $420.00, and $53.00 per interceptor, separator, or catch basin

Total Valuation

  • Reinspection, additional plan reviews, changes, revisions
    • $64.00
      • Per hour (1/2 hr minimum)
  • Swimming Pools
      • By Building Permit valuation as noted above
  • Roofing
    • $100.00
  • Siding
    • $100.00
  • Demolition
    • $64.00
  • Inspections when no City Permit is issued 
    • $64.00
  • Manufactured Homes (Mobile homes in courts)
    • $64.00
  • Moving Permits within or into City limits
    • $300.00
  • Moving Permits out of City limits and manufactured home placement within a licensed manufactured home community
    • $64.00
  • Investigation Fee - Construction started without a permit 
      • Fee equal to the permit fee of the attributable 
        building permit, limited to $5,000. 
  • Commercial Building Plan Review
    • 25% Of the building permit fee

 

* For the use of outside consultants for plan review or inspections-fee equal to actual cost plus 10% administration. Inspection fee charge for inspections of buildings to be moved into or within the city are $63.00. Buildings which are located more than 10 miles from the city $63.00 PLUS .50 cents/mile.

*A Minnesota State Surcharge of $1.00  is applied to 'other permits'.

*An investigation fee equal to the permit fee shall be charged whenever work is started prior to obtaining a permit.