- PDF Electronic Copy (pass-through cost to 3rd party vendor)
- $15.00
- Virtual/On-line bidding (pass-through cost to 3rd party vendor)
- $30.00
- Paper Plan Sets
- At Cost
Engineering Fee Schedule
- Engineering Lawn Grades
- $60.00
- Per Occurrence
- $60.00
Permits for Work Within the Right-of-Way
- Underground Utility Installation / Repairs
- $25,000
- Contractor Bond to Work Within City Right-of-Way
- Same as City Construction Contract (General Conditions Section 00800)
- Insurance Required to Work Within City Right-of-Way
- $25,000
- Boring/Trenching and Excavations
- $295.00*
- 0' - 500'
- $635.00*
- 501' -1,500'
- $1,410.00*
- 1,501' - 5,000'
- $295.00*
*Fee includes $20.00 Storm Water Application Fee
Temporary Lane Closure Permit (only if a Right-of-Way permit is not required)
- Local or Local Collector Street - partial closure, no detour required
- $ - Per week
- Local or Local Collector Street - full closure, detour required
- $20.00 Per week
- Sidewalk or Bike Path - full closure
- $20.00 Per week
- Arterial or Collector Street-parking Lane or shoulder closure
- $ - Per week
- Arterial or Collector Street-traffic Lane closure, no detour required
- $20.00 Per week
- Arterial or Collector Street - full closure, detour required
- $100.00 Per week
- Overweight / Overdimensional Vehicle Permit
- $20.00 Each
Wireless Telecommunication Facilities Within Right-of-Way
- Permit
- $250.00 Each
- Annual Rent
- $150.00 Each
- Annual Maintenance
- $25.00 Each
- Power less than or equal to 100 watts
- $73.00 Per radio node per month
- Power greater than 100 watts
- $182.00 Per radio node per month
Driveway Approach / Curb & Gutter / Sidewalk
- Driveway Approach
- $ 60.00 Each
- Curb & Gutter or Sidewalk (excluding driveway width)
- $ 60.00 per 50-foot increment
- Contractor Bond to Work Within City Right-of-Way
- $10,000.00
- Insurance Required to Work Within City Right-of-Way
- Same as for City Construction Contract (General Conditions Section 00800)
- Grading/Erosion Control Permit
- $25.00 up to 1 acre
- $12.50 per additional acre
- Annual Permit for New Subdivisions
- $250.00
Plan Review Fee for Privately Financed Infrastructure
- The first $100,000 of estimated construction cost
- 2%
- All cost above the first $100,000 of est. construction cost
- 1%
- All maps 11" x 17" or less
- $ 0.00
- All maps plotter size C or larger
- $10.00
- Special Mapping requests or custom projects
- $40.00 Per hour + media costs
- Administration Fees
- 5% Of Construction and Engineering Cost
- Applied to all Assessed Projects
- 5% Of Construction and Engineering Cost
- Engineering Fees
- 13% Of Construction Cost
- Applied to Publicly or Privately Financed Public
Infrastructure Projects - Design and Construction
Engineering by City
- Applied to Publicly or Privately Financed Public
- 13% Of Construction Cost
- Engineering Fees
- 7% Of Construction Cost
- Applied to Public Infrastructure Projects - Design
Privately Funded; but either the Construction is
publicly funded or construction engineering
services are completed by the City
- Applied to Public Infrastructure Projects - Design
- 7% Of Construction Cost
- Primary Benefit Rate; Local & Minor Arterial/Collector Streets
- Urban Mill & Overlay
- $45.00 Per adjusted front foot
- Rural Mill & Overlay
- $27.50 Per adjusted front foot
- Rehabilitation (limited curb & gutter repairs)
- $93.00 Per adjusted front foot
- Reconstruction (full curb & gutter replacement)
- $145.00 Per adjusted front foot
- Rural Reconstruction
- $68.00 Per adjusted front foot
- Urban Mill & Overlay
- Secondary Benefit Rate
- Minor Arterial/Collector Streets
- Mill & Overlay, Rehabilitation, Reconstruction
- $ 620.00 Per equivalent single family lot
- Sidewalk Panel Repairs (not otherwise included in a street project)
- $12.00 Per square foot
- Curb & Gutter Repairs (not otherwise included in a street project)
- $38.00 Per lineal foot