11 St & 14 St Corridor Study
The City of Moorhead is studying the 11 St and 14 St corridors, which currently operate as a one-way street pair between Main Ave and 12 Ave S.
Take the survey and provide feedback on the potential conversion of both corridors to two-way streets.
11 St & 14 St Corridor Study Open House 2
October 13, 2026 from 3:30 pm – 5:30 pm at the Christianson Alumni Center (707 11 St S. Moorhead, MN 56563)
The City of Moorhead is studying the 11 St and 14 St corridors between Main Ave and 12 Ave S. Join us to share your feedback on a potential two-way street conversion and other near-term and long-term improvements for walking, biking and driving.
Bonus Feedback Opportunity!
Learn more and share your input on the conceptual plans for native plantings and amenities included in the nearby Stormwater Pond Project.
No formal presentation. Stop by any time.